Explore Our Complete Catalog
Browse our full range of products and specifications
1 1/2" X 4" PLASTIC DOWEL
CAPS
1/2" TO 1 1/4" PLASTIC DOWEL TUBES
SIZES: 1/2". 5/8", 3/4", 1", 1 1/4"
12" TYPE 4AC HALF HANGER
12", 14", 16", 20" AND 42" BRIDGE HANGERS 90° ENDS EG
The C60 - Type 1 - Pres-Steel Hanger is used for a zero haunch condition and consists of two 1/2" end sections welded to a single wire strut. The hanger allows installation and adjustment from the top of the formwork and works equally well on steel or precast concrete beams.
12", 14", 16", 20" AND 42" HD BRIDGE HANGER WITH 45° AND 90° ENDS-GALV
The C60 - Type 4A - Pres-Steel Hanger is fabricated with one 90° and one 45° 1/2" interlock-type end sections welded to a substantial wire strut. The Type 4A hanger is a high-strength hanger used to support bridge deck exterior formwork and is especially designed to react to lateral forces prevalent in many forming conditions.
C-24 TYPE 4-APR ELECTRO GALV PRECAST HALF HANGER
C-24 TYPE 4AC HALF HANGER 12" GALVANIZED
C24 45° Pres-Steel Half Hangers are manufactured with a single 1/2" end section welded to a jogged wire strut and are used where conditions prevent the use of standard double-ended hangers. Standard Style AC hangers measure 12" from the centerline of the bolt to the end of the strut. This style hanger is designed to be welded to the rebar stirrups of precast concrete bridge beams.
C-67 TIE BAR BEAM CLIP HANGER TYPE 1 EPOXY COATED OR E-GALV A=7-1/2" H=3-1/2"
C-67 Tie Bar Beam Clip Pre-stress Hanger is an ideal half hanger for supporting overhang formwork over stay-in-place decking. These half hangers are fabricated with the strut wire formed into a “J” shape so it engages the edge of the flange. A 90° interlock end clip is welded to the strut wire to provide increase capacity. This hanger is furnished with a 90° end clip that accepts a 1/2" diameter coil rod or bolt. Other sizes and configurations available. Contact technical service for assistance.
C67 TYPE 1 TIE BAR BEAM CLIP HANGER EPOXY COATED OR E-GALV A=7/1/2" H=5"
C-67 Tie Bar Beam Clip Pre-stress Hanger is an ideal half hanger for supporting overhang formwork over stay-in-place decking. These half hangers are fabricated with the strut wire formed into a “J” shape so it engages the edge of the flange. A 90° interlock end clip is welded to the strut wire to provide increase capacity. This hanger is furnished with a 90° end clip that accepts a 1/2" diameter coil rod or bolt. Other sizes and configurations available. Contact technical service for assistance.