Explore Our Complete Catalog
Browse our full range of products and specifications
C CELL BATTERIES
12 PER BOX
C-24 15" TYPE 4AC HALF HANGER
W/1 B13 1/2" COIL NUT EACH
C-24 TYPE 4-APR ELECTRO GALV PRECAST HALF HANGER
C-24 TYPE 4AC HALF HANGER 12" GALVANIZED
C24 45° Pres-Steel Half Hangers are manufactured with a single 1/2" end section welded to a jogged wire strut and are used where conditions prevent the use of standard double-ended hangers. Standard Style AC hangers measure 12" from the centerline of the bolt to the end of the strut. This style hanger is designed to be welded to the rebar stirrups of precast concrete bridge beams.
C-4 1" SQUARE STICK-E WASHERS
1000 PER BOX
C-4 2-9/16" PIN 2 X WOOD TO
CONCRETE
C-49 BRIDGE OVERHANG BRACKET
NON STOCK All Dayton Superior Bridge Overhang Brackets–including C49 Bridge Overhang Brackets–are designed with maximum adjustibility to meet the varied overhang forming requirements on either structural steel or precast/prestressed concrete beams. Can easily be mounted to steel beams, precast concrete beams and concrete box beams with the appropriate hanger devices.
C-49-D OVERHANG BRACKET
NON STOCK The C49D - Bridge Overhang Bracket - D has all of the features of the C49 bracket but has longer vertical and diagonal legs. The longer legs, and resulting increase in adjustment, allow the bracket to be used on deep structural steel beams to position the construction load transfer near the beam's bottom flange.
C-67 TIE BAR BEAM CLIP HANGER TYPE 1 EPOXY COATED OR E-GALV A=7-1/2" H=3-1/2"
C-67 Tie Bar Beam Clip Pre-stress Hanger is an ideal half hanger for supporting overhang formwork over stay-in-place decking. These half hangers are fabricated with the strut wire formed into a “J” shape so it engages the edge of the flange. A 90° interlock end clip is welded to the strut wire to provide increase capacity. This hanger is furnished with a 90° end clip that accepts a 1/2" diameter coil rod or bolt. Other sizes and configurations available. Contact technical service for assistance.